Construction of an electrode boiler system at the Nossener Brücke combined heat and power plant site

Details
Auftraggeber
DREWAG Stadtwerke Dresden GmbH
Land
Germany
Standort
Dresden
Zeitraum
2016 – 2018

Construction of an electrode boiler system at the Nossener Brücke combined heat and power plant site

Construction of an electrode boiler plant for the central district heating network of the city of Dresden at the Nossener Brücke combined heat and power plant.

The contract was awarded in six different lots, part of which was planned by Dornier Power and Heat ready for execution. As part of the project supervision, Dornier Power and Heat took over the construction and installation supervision for all lots (except construction).

An overview of the services provided by Dornier Power and Heat

  • Design planning, approval planning
  • Implementation planning
  • Preparation of the contract award
  • Assistance with the contract award
  • Project supervision (construction supervision), documentation
  • Project management