Renewables

TSPG-E001: Tasiast Solar Generation Project – Owner’s Engineering services for the PV-BESS project in Mauritania.

Details
Client
Kinross Gold Corporation
Country
Location
Mauritania
Period
05/2022 – 09/2023

The project consists of three main components:

  • A solar PV plant with a capacity around 42.5MWp with the purpose to generate renewable energy to reduce heavy fuel oil consumption at the Tasiast mine
  • A battery system with a capacity around 18MW and 9MWh with the purpose to smoothen the solar power output and stabilize the Tasiast power system
  • An Energy Management and SCADA system allowing for a seamless integration

More References

Mehr laden