Power & Heat

Installation of mercury emission measurements at the Boxberg power station

Details
Auftraggeber
LEAG Lausitz Energie Kraftwerke AG
Land
Germany
Standort
Boxberg
Zeitraum
01/2018 – 02/2019

Installation of mercury emission measurements at the Boxberg power station

At the Boxberg power plant, officially approved mercury measuring devices from Sick and Durag were installed on the clean gas side of Block Q (900 MW) and Block R (675 MW). These measurements ensure official monitoring of mercury emission values. These measurements were integrated into the main control technology and into the official monitoring system of the central EMI computer.

Our services at a glance:

  • Planning services in the field of electrical and control technology
  • Planning of all interfaces
  • Construction management/supervision
  • Commissioning of the systems
  • Quality assurance during the installation and commissioning phase