At the Boxberg power plant, officially approved mercury measuring devices from Sick and Durag were installed on the clean gas side of Block Q (900 MW) and Block R (675 MW). These measurements ensure official monitoring of mercury emission values. These measurements were integrated into the main control technology and into the official monitoring system of the central EMI computer.
Our services at a glance: