Power & Heat

Installation of activated carbon dosing systems at the Lippendorf power station

Details
Auftraggeber
LEAG Lausitz Energie Kraftwerke AG
Land
Germany
Standort
Neukieritzsch
Zeitraum
01/2018 – 02/2019

Installation of activated carbon dosing systems at the Lippendorf power station

In order to adapt the power plant units at the Lippendorf power plant to the increased requirements for compliance with Hg emission limits, activated carbon injection systems were installed in both units R and S in the flue gas stream upstream of the electrostatic precipitators to reduce the mercury content in the flue gas.

Dornier Power and Heat provided all planning services for the installation of the activated carbon dosing systems up to handover to the operator.

Our services at a glance:

  • Approval planning, preparation of the approval application
  • Contract award planning
  • Execution planning: layout and construction planning, planning services for plant and mechanical engineering
  • Planning services in the field of electrical and control engineering
  • Planning of all interfaces
  • Construction management/supervision
  • Commissioning of the plants