Power & Heat

New construction of the Marzahn combined heat and power plant

Details
Client
Vattenfall Europe Wärme AG
Country
Germany
Location
Berlin
Period
2015 – 2020

The new Berlin-Marzahn cogeneration plant will be a natural gas-fired gas and steam turbine power plant with district heating extraction. At the heart of the plant is an SGT5-2000E gas turbine.

From 2020, the new cogeneration plant will simultaneously supply electricity and district heating to eastern Berlin. The plant will have an electrical output of 260 MW and a thermal output of around 230 MW.

Dornier Power and Heat is supporting the client in the tendering process, the provision of connection points, planning, quality assurance, CHP subsidies and acceptance.

An overview of the services provided by Dornier Power and Heat

  • Review of tender documents
  • Negotiation of the LTSA and support with EPC award
  • CHP expertise and application for preliminary CHP approval
  • Quality management and establishment of the most important processing procedures
  • Engineering of existing interfaces and participation in plan review for EPC and integration into existing structures
  • Construction supervision and construction management for existing interfaces
  • Factory inspections and quality assurance with expert support
Themen